VALE
-
❖Conceptual, basic and detailed projects for new primary crushing at the mine in "N5" BMSIII, Carajás - Input Capacity = 8,000 t / h, 280 t trucks, conveyor system with approximately 7.0 km, Carajás - PA.
-
❖Conceptual project system for mobile crushing system and conveyors for long distance approx.: 15 km to the ore body "N1 - Capac.: 8,000 t / h for trucks 280 t, Carajás - PA.
-
❖Conceptual project with estimated investment for the port adaptations of "Nova Palmira" for handling Iron Ore - Nova Palmira - Uruguay.
-
❖Conceptual project with estimated investment for the port adaptations of "San Nicolas" for handling iron ore - Argentina.
-
❖Conceptual project for stockyard and shipment of iron ore at Antonio Maria Coelho to 7.5 mtpy and 15 mtpy - Corumbá - MS.
-
❖Basic project for the expansion of the port Gregório Curvo contemplating floating dock system and all handling / storage of iron ore, Corumbá, MS.
-
❖Conceptual project options Ports in Paraguay River for expansion to 15 Mtpy - Corumbá, MS.
-
❖Conceptual project of transport options for long distance belt conveyors from the mine to the Ports to 15 mtpy, Corumbá, MS.
-
❖Conceptual project for port facilities upgrading at Gregório Curvo Port - Iron ore to 7.5 mtpy and 15 mtpy - Corumbá - MS.
-
❖Conceptual project for Stockyard and shipment of iron ore at Antonio Maria Coelho site to 7.5 mtpy and 15 mtpy Corumbá - MS.
-
❖Basic and detailed project for the expansion of the port Gregório Curvo for 2 mtpy - Iron Ore - Corumbá - MS.
-
❖Conceptual project for the complement system in cargo barges of iron ore in Asuncion - Asunción - Floating Barge top-off - Asuncion - Paraguay.
-
❖Basic and detailed project and management of extensions of port facilities, railroad retirement and construction of new rail loop - Port Gregório Curvo - Corumbá - MS.
-
❖Conceptual project for belt conveyors for long distance and high-speed, 8.0 km to convey bauxite - Paragominas - MG.
-
❖Conceptual project with estimated investments of alternative transport potassium to be produced at Mendoza Mine, Argentina, by barges from the Port of San Nicolas and Rosario to Corumbá through the Paraguay and Paraná rivers (Rio Colorado Potash).
CSN (Casa de Pedra)
-
❖Conceptual project system for long distance transport, approx. 3.0 km, stockyard and loading of iron ore capacity: 1,000,000 t.
SAMARCO
-
❖Master plan for expansion of the port complex of Ponta UBU for new ventures, including conceptual design of marine works, the new stockyards and pear station.
-
❖Conceptual project for stacking system and recovery of ore from Alegria Sul - Germano Mine.
-
❖Conceptual project of alternative routes of belt conveyors Fábrica Nova / Germano / Alegria - Mine Germano.
-
❖Conceptual project for trimming system for the stockyard of Pellets - Ponta UBU.
-
❖Conceptual project and basic project to expand the system of loading ships to 11,200 t / h - Ponta UBU.
-
❖Basic and detailed projects for upgrading pelletizing machine discharge belt conveyors - Plant I - UBU - ES.
-
❖Conceptual project for the mine crushing system, long distance belt conveyors approx. 7.0 km and stacking system with successive cells in the area of provision named Natividade - 7.500 t / h - Germano - Mariana - MG.
UNAMGEN
-
❖Conceptual and basic project for new port facilities at the Port of Santana on the Amazon River - AM.
GERDAU - AÇOMINAS
-
❖Conceptual Basic and detailed projects for new rail loop and railcar loading yard - Iron Ore – Ouro Branco - MG.
BUNGE - THE MARINE TERMINAL GUARUJÁ
-
❖Basic and detailed projects of system modifications reception handling and storage of fertilizers and sulfur - also including dust collection system, sprinkler surfactants and wastewater treatment - Port of Guaruja - SP.
-
❖Basic project for the dispatch system handling fertilizers and sulfur - Port of Guaruja - SP.
-
❖Basic project for Bulk Handling system of TGG, the reception by the Railroad / Highway to loading on ships - Port of Guaruja / SP.
PETROBRÁS
-
❖Conceptual project for alternative transport ore and schist in the region of the mine of Rio das Pedras, PR, using trucks and conveyor belts "two-way" 6.0 km - Paraná.
KINROSS
-
❖Conceptual project with estimated investment for installation of primary crushing at the mine, long distance belt conveyors (2.0 km), general changes in processing facilities of gold ore to increase capacity to 3,000 t / h. Paracatu - MG.
MINERAÇÃO RIO DO NORTE S / A – MRN
-
❖Basic and detailed projects for the new Platô Monte Branco (the mine crushing plants, support facilities and long distance belt conveyors ~ 5km) High Speed – Porto Trombetas / PA.
-
❖Conceptual project for new Platô Teófilo and Cipó 14 km away from the beneficiation plant interconnected by high-speed long distance belt conveyors- Trombetas - PA.
-
❖Comparative studies (CAPEX and OPEX) long distance belt conveyors between conventional and high-speed application in the transportation systems in Bauxite Mines – Trombetas - PA.
YAMANA
-
❖Basic and detailed projects for crushing system in Mine, long distance belt conveyors, 2.0 km, to beneficiate copper ore, Maraca - GO.