VALE


  1. Carajás - Contract "Umbrella" for development of conceptual, basic and detailed projects - term: 3 years.


  1. Conceptual, basic and detailed projects for new primary crushing at the mine in "N5" BMSIII, Carajás - Input Capacity = 8.000t / h, 280t trucks, conveyor system with approximately 7.0 km, Carajás - PA.


  1. Manganese Project Azul - basic and detailed projects modifications to facilities in pellet-feed concentration of manganese, Carajás - PA.


  1. Basic project for overhauling tailing pipe line system to Campo Grande - Alegria Mine - Mariana, Minas Gerais.


  1. Global water treatment plant balance and development of basic and detailed projects providing expansion to 85 mtpy, Carajás - PA.


  1. Conceptual, basic and detailed projects for adequacy of facilities to receive Timbopeba ore from Fábrica Nova.


  1. Conceptual, basic and detailed projects upgrading filtering pellet-feed plant, Larox filters installation to capacity of 82.5 mtpy - Carajás - PA.


  1. Basic project for new silo for shipment to expand capacity of 82.5 mtpy - Carajás - PA.


  1. Conceptual, basic and detailed projects system for addition of silica in iron ore silo next to the loading station, Carajás - PA.


  1. Basic and detailed projects for new firefighting system, Carajás - PA.


  1. Conceptual, basic and detailed projects system for overall recovery of waste treatment plant, aiming to environmental protection and restoration of water, Carajás - PA.


  1. Detailed project for overhauling the tertiary screening plant, Carajás - PA.


  1. Conceptual project for a new dam and water catchment dam in the Railway Pear, Carajás - PA.


  1. Conceptual projects system for mobile crushing system and conveyors for long distance approx.: 15 km to till the Body "N1 - Capacity: 8,000 t / h for trucks 280 t, Carajás - PA.


  1. Basic and detailed projects for the new tailings thickener to increase to 85 mtpy, Carajás - PA.


  1. Basic and detailed projects for waste dump and dams for sediment containment - Mine N5S - Carajás.


  1. Basic and detailed projects for the expansion of main electrical room - SE1810 230 KV III Bay, Carajás - PA.


  1. Optimization of operating mills: determining the "Work Index". Analysis of grindability testing and diagnosis of grinding operation of the plant Nibrasco / Supel .


  1. Design of technological development: the process of reducing moisture in sinter pile - Carajás.


  1. Access Road for Mine Brucutu in São Gonçalo do Rio Abaixo - MG.


  1. Detailed project access roads on the route of the long distance belt conveyor - "Pico Project".


  1. Detailed project earthwork and drainage channel diversion of creek Luiza dos Santos, located at the rail terminal Andaime.


  1. Conceptual, basic and detailed projects installation to another disc filter in filtering plant - Mine Mutuca - Nova Lima - MG.


  1. Conceptual, basic and detailed projects recovery facilities and waste through cycloning tower spiral concentrators - Vargem Grande - Itabirito - MG.


  1. Conceptual, basic and detailed projects system for water supply to the terminal port of Guaiba Island (TIG).


  1. Conceptual, basic and detailed projects installation screening of "LO" in the port terminal Guaiba Island (TIG).


  1. Capitão do Mato - Basic projects for "environmental licensing" of facilities for iron ore beneficiation of Capitão do Mato e Várzea Grande. Capacity: 10 million t / y.


  1. Expansion and improvement of IC's Morro Agudo - Conceptual, basic and detailed projects facility concentration of iron ore - Rio Piracicaba - MG.


  1. Córrego do Meio - Detailed project for re-screening Sinter-feed, magnetic separation and gravity concentration - Sabara - MG.


  1. Mine-Alegria - Flotation – Beneficiation – Plant - IB-III: Conceptual project optimization flow for pulp flotation plant - Mariana - MG.


  1. Conceptual and basic project for installation of plant for lump re-crushing granules for IC's Morro Agudo - Rio Piracicaba - MG.


  1. Conceptual, basic and detailed projects system for pumping waste into the Vale das Cobras, 6.0 km - Mine Água Limpa, Rio Piracicaba - MG.


  1. Conceptual, basic and detailed projects for upgrading the water pipeline Diogo - Mine Água Limpa, Rio Piracicaba - MG.


  1. Conceptual project with estimated investment for the treatment plant for iron ore. Capacity of 10 Mtpy of product. Corumbá - MS.


  1. Conceptual project with estimated investment for the port adaptations of "Nova Palmira" for handling Iron Ore - Nova Palmira - Uruguay.


  1. Conceptual project with estimated investment for the port adaptations of "San Nicolas" for handling iron ore - Argentina.


  1. Conceptual, basic and detailed projects for the new processing plant PB4 (Iron ore) - Corumbá, MS.


  1. Conceptual, basic and detailed projects for Pilot Plant - Corumbá, MS.


  1. Conceptual and basic projects with investment estimate for New Plant for processing of iron ore Upper-zone, Lower-zone and Jaspelite capacity: 20 mtpy - Corumbá, MS.


  1. Basic project for the expansion of the port Gregório Curvo contemplating fluctuating pier and system of handling / storage of iron ore, Corumbá, MS.


  1. Conceptual project for options Ports in Paraguay River for expansion to 15 mtpy - Corumbá, MS.


  1. Conceptual project of transport options for long distance belt conveyors from the mine to the Ports to 15 mtpy, Corumbá, MS.


  1. Conceptual project enhancements to the facilities of the Port Gregório Curvo - Iron ore to 7.5 mtpy and 15 mtpy - Corumbá - MS.


  1. Conceptual project and basic access road approx: 36.0 km Mine - Porto in Albuquerque - Corumbá - MS.


  1. Conceptual project for stockyard and shipment of iron ore in Antonio Maria Coelho to 7.5 mtpy and 15 mtpy - Corumbá - MS.


  1. Conceptual project and basic contemplating sprinkler and drainage systems for the expansion of the port in San Nicolas - Argentina for receipt and shipment of iron ore from Corumba - MS.


  1. Basic and detailed project for the expansion of the port in Gregório Curvo for 2 mtpy - Iron Ore - Corumbá - MS.


  1. Conceptual project for the complement system in cargo barges of iron ore in Asuncion - Asunción - Floating Barge top-off - Asuncion - Paraguay.


  1. Basic and detailed projects for the PM-03 - Corumbá - MS.


  1. Basic and detailed projects and management of extensions of port facilities, railroad retirement and construction of new rail loop - Port Gregório Curvo - Corumbá - MS.


  1. Overall water balance of factory facilities covering Pelletizing and Beneficiation Plant - Iron Ore - Congonhas, Brazil.


Note: Include the companies acquired by VALE (Samitri, Ferteco, MCR, MBR)


CSN (Casa de Pedra)


  1. Conceptual project system for long distance best conveyor, approximately: 3.0 km, stockyard and loading of iron ore capacity: 1,000,000 t.


  1. Conceptual, basic and detailed projects for water capture dam and Maria Coelho.


  1. Detailed project for environmental permits for the stacks of waste Batateiro de Cima and Baixo including access roads.


  1. Projects for the basic and detailed operational support facilities at the mine, necessary for the expansion, workshops heavy trucks, light vehicles, laboratories, physical / chemical, polyurethane processing, hydrogeology and shed to waste.


KOBE STEEL


  1. Supervision of pre-operation and diagnosis of plant beneficiation of iron ore and phosphate Chador Malu - Iran


SAMARCO


  1. Design of technological development: reducing the phosphorus content in iron ore pellets.


  1. Optimization of the load current: primary operating mill with ore from Alegria Mine.


  1. Master plan for expansion of the port complex of Ponta UBU for new ventures, including conceptual design of marine works, the new stockyards and pear station.


  1. Conceptual, projects basic and detailed installation for the 10th disc in pelletizing plant in Point I of UBU.


  1. Conceptual project for system storage tanks and transfer supply to the pipeline - Germano Mine.


  1. Conceptual project for stacking system and recovery of ore from Alegria Sul - Germano Mine.


  1. Conceptual project of alternative routes of belt conveyors Fábrica Nova / Germano / Alegria - Mine Germano.


  1. Conceptual project for trimming system for the pellets stockyard of Pellets - Ponta UBU.


  1. Conceptual and basic project to expand the system of loading ships to 11,200 t / h - Ponta UBU.


  1. Basic project system for solid waste handling - Iron Ore - UBU - Guarapari - ES.


  1. Basic and detailed project treatment system and monitoring of cooling water from cooling towers of electrical motors - UBU - ES.


  1. Basic and detailed projects for the expansion of screening and upgrading of belt conveyors, circuit crushing and screening - Germano Mine - Mariana - MG.


  1. Basic and detailed project system for pumping water from the EP-02 - Germano Mine - Mariana - MG.


  1. Basic and detailed project for upgrading pelletizing machine discharge belt conveyors - Plant I - UBU - ES.


  1. Basic and detailed project for the building expansion screening plant with banana screens - Germano / MG.


  1. Conceptual project for the mine crushing system, long distance belt conveyors  approximately: 7.0 km and stacking system with successive cells in the sterile ore area named Natividade – 7,500t / h - Germano - Mariana - MG.


UNAMGEN


  1. Conceptual, basic and detailed projects for beneficiation plant for iron ore Amapari Project - Capacity: 1.5 mtpy - AM.


  1. Conceptual and basic design for new port facilities at the Port of Santana on the Amazon River - AM.


V & M MINERAÇÃO


  1. Conceptual basic and detailed projects for new iron ore treatment plant Mine Pau Branco , 8.5 mtpy product contemplating crushing plants, screening, jigging, filtering, magnetic separation, pipeline and tailings, Itabirito / MG.


GERDAU - AÇOMINAS


  1. Conceptual, Basic and detailed projects for new railroad loop and railcar loading yard - Iron Ore – Ouro Branco - MG.


  1. Agreement "Umbrellas" for projects in Iron Ore - 2 years.


ARCELORMITTAL


  1. Basic and detailed projects for magnetic separation circuit of medium and high intensity for the beneficiation plant for iron ore - Itatiaiuçu - MG.


MAIN PROJECTS IN THE IRON ORE AREA
Minerio.html
Ports.html
Polymetallic.html

Click here to learn more

Home.html

Click here to learn more

Click here to learn more

The best engineering solution for your project